Technical aspects and tests.

GATWICK AIRPORT

2000-05-17
GATWICK AIRPORT – CONCRETE REPAIRING “THE EASY WAY” WITH ELASTO-COAT  ( No sawing and only material in the damage and can be applied to zero )

HEATHROW AIRPORT

00-06-14 - Moulding Cable chase – PMS-4 (colour orange)

00-06-13 – Moulding Cable chase – Time taken = 146 m / 20 minutes

STANSTEAD AIRPORT

Taxiway Lights – Stansted Airport – 1999-07-16 – PMS-4

 

 

  © Copyright I P O S Trading & Consulting Ltd